New Equipment Form

  • Numbers of cranes required :
  • CMAA Class :
  • Indoor or Outdoor :
  • Capacity (in tons) :
  • Single Girder or Double Girder :
  • Top Running or Under Running :
  • Span (in ft) :
  • # of hoists per crane :
  • Required Hook Lift (in ft) :
  • Floor to lowest hanging obstruction (in ft) :
  • Existing Runway or New:
  • Runway type :
  • OMI to provide :
  •  Runway Beams  Crane Rail  Conductor Bar
  • Approximate length of runway (in ft) :
  • How far apart are column centers (in ft) :
  • Number of cranes on runway:
  • More than 1 crane in a bay :
  •  Yes  No
  • Power (voltage) :
  • Control :
  • Company Name/Location :
  • Contact Info :
  • Additional Comments :